CV's of Consultant | Appointed

 
SrNoName of AssignmentProject NameState NameConsultant NameConsulatant TypeGM NameAgreement Date 
1Widening and strengthening of existing National Highways from 2 lane to 4 lane from km.60.00 to km.30.00 in Nalbari to Bijni section of NH-31 on East-West Corridor under Phase-II Programme of NHDP Contract Nalbari to Bijni Section of NH-31AssamM/s.Louis Berger Group Inc., USASupervision ConsultantSh P C Arya16/9/2005
2Supervision Consultancy of 4-laning under 3 civil contract Packages No EW-II (AS-21,22 & 23) of NH-54 in the state of Assam on East West Corridor under Phase-II Programme of NHDP {Consultancy Packages No AS-SC-1} - For AS 21 Jatinga Junction to Harangajo section of NH-54AssamM/s. Intercontinental Consultants and Technocrats Pvt. Ltd.Supervision Consultant Sh P C Arya7/7/2006
3Supervision Consultancy of 4-laning under 3 civil contract Packages No EW-II (AS-21,22 & 23) of NH-54 in the state of Assam on East West Corridor under Phase-II Programme of NHDP {Consultancy Packages No AS-SC-1} - For AS 22Narimbanglo to Jatinga Junction section of NH-54AssamM/s. Intercontinental Consultants and Technocrats Pvt. Ltd.Supervision ConsultantSh P C Arya7/7/2006
4Supervision Consultancy of 4-laning under 3 civil contract Packages No EW-II (AS-21,22 & 23) of NH-54 in the state of Assam on East West Corridor under Phase-II Programme of NHDP {Consultancy Packages No AS-SC-1} - For AS 23Four Laning from Maibong to Nrimbanglo Section of NH-54 AssamM/s. Intercontinental Consultants and Technocrats Pvt. Ltd.Supervision ConsultantSh P C Arya7/7/2006
5Supervision Consultancy Services for Domestic Funded Civil Projects (AS-24, AS-25, AS-26 & AS-27) of 4 laning in the state of Assam on NH-54 on East-West Corridor under NHDP Phase-II (Package No. AS-SC-2) - For AS-24Lumding to Maibong section of NH-54EAssamM/s. SMEC International Pvt. Ltd.Supervision ConsultantSh P C Arya19/5/2006
6Widening and strengthening of existing National Highway from 2- lane to 4-lane from km.30.00 to km.0.00 of Bijni to West Bengal border section of NH-31 C in Assam on East corridor Under phase –II programme of NHDP. {Contract Package No- EW-II (AS – 12)} Bijni to Assam/WB Border Section (AS-12)AssamLouis Berger Group, Inc.Supervision ConsultantSh P C Arya16/9/2005
7Supervision Consultancy of Civil Projects of 4-laning of 4 Civil Contract Packages No.EW-II (AS-10, AS-11, AS-12) in the State of Assam Bijni to Assam/WB Border Section (AS-10)AssamM/s.Louis Berger Group Inc. USASupervision ConsultantSh P C Arya16/9/2005
8Widening and strengthening of existing National Highway from 2 lane to 4 lane from km 40.00 to km 60.50 of Maibong to Lumding section (AS-27) of NH-54 in Assam.Maibong to Lumding section (AS-27) of NH-54 AssamM/s SMEC Ltd.Supervision ConsultantSh P C Arya19/5/2006
9Widening and strengthening of existing National Highway from 2 lane to 4 lane from km 111.00 to km 83.40 of Maibong to Lumding section (AS-25) of NH-54 in Assam.Maibong to Lumding section (AS-25) of NH-54 AssamM/s SMECSupervision ConsultantSh P C Arya19/5/2006
10Widening and strengthening of existing National Highway from 2 lane to 4 lane from km 83.40 to km 60.50 of Maibong to Lumding section (AS-26) of NH-54 in Assam.Maibong to Lumding section (AS-26) of NH-54 AssamM/s SMEC Ltd.Supervision ConsultantSh P C Arya19/5/2006
11Widening and strengthening of existing National Highway from 2 lane to 4 lane from km 1121.00 to km 1093.00 of Guwahati to Nalbari section (AS-04) of NH-31 in Assam.Guwahati to Nalbari Section (AS-04) AssamM/s BCEOM-Stup-Aarvee (JV)Supervision ConsultantSh P C Arya15/9/2005
12Widening and strengthening of existing National Highway from 2 lane to 4 lane from km 1093.00 to km 1065.00 of Guwahati to Nalbari section (AS-05) of NH-31 in Assam.Guwahati to Nalbari section (AS-05) of NH-31 AssamM/s BCEOM-Stup-aarvee (JV)Supervision consultantSh P C Arya15/9/2005
13Widening and strengthening of existing National Highway from 2 lane to 4 lane from km 1065.00 to km 1040.30 of Nalbari to Bijini section (AS-06) of NH-31 in Assam.Nalbari to Bijini section (AS-06) of NH-31 AssamM/s BCEOM-Stup-aarvee (JV)Supervision ConsultantSh P C Arya15/9/2005
14Widening and strengthening of existing National Highway from 2 lane to 4 lane from km 1040.30 to km 1013.00 of Nalbari to Bijni section (AS-07) of NH-31 in Assam.Nalbari to Bijni section (AS-07) of NH-31 AssamM/s BCEOM-Stup-aarvee (JV)supervision consultantSh P C Arya15/9/2005
15Widening and strengthening of existing National Highway from 2 lane to 4 lane from km 183.000 to km 163.895 of Sonapur to Guwahati section (AS-03) of NH-37 in Assam.Sonapur to Guwahati section (AS-03) of NH-37AssamM/s RITES Ltd.Supervision consultantSh P C Arya30/6/2005
16Widening and strengthening of existing National Highway from 2 lane to 4 lane from km 255.00 to km 230.50 of Dharamtul to Raha section (AS-02) of NH-37 in AssamDharamtul to Raha section (AS-02) of NH-37 AssamM/s Lea Associates South Asia Pvt. Ltd.Supervision ConsultantSh P C Arya23/12/2005
17Widening and strengthening of existing National Highway from 2 lane to 4 lane from km 205.00 km 183.00 of Dharamtul to Sonapur section (AS-20) of NH-37 in Assam.Dharamtul to Sonapur section (AS-20) of NH-37 AssamM/s RITES Ltd.Supervision ConsultantSh P C Arya18/8/2005
18Widening and strengthening of existing National Highway from 2 lane to 4 lane from km 230.500 to km 205.000 of Dharamtul to Jagiroad section (AS-19) NH-37 in Assam.Dharamtul to Jagiroad section (AS-19) NH-37 AssamM/s RITES Ltd.Supervision ConsultantSh P C Arya23/8/2005
19Construction of New Brahamputra Bridge (km 1121 - 1126) near Guwahati on NH-31 in Assam (AS-28)Construction of New Brahamputra Bridge (km 1121 - 1126) near Guwahati on NH-31 in Assam (AS-28)AssamM/s Mott MacDonald Private LimitedSupervision ConsultantSh P C Arya13/11/2006
20Consultancy Services for Supervision of short term improvement and routine maintenance O&M of Aurangabad - Gorhar from km 180.00 to km 320.00 and Gorhar to Barwa Adda from km 320.00 to 398.750 of NH-2 in the state of Bihar and Jharkhand.Aurangabad - Gorhar and Gorhar to Barwa AddaBihar and JharkhandM/s Redecon (India) Pvt. Ltd.Supervision ConsultantSh. Arun Jagga1/7/2014
21IESix laning of Surat-Dahisar Section of NH-8GujaratM/s CEG Ltd.IEShri C. K. Sinha1/4/2015
22Independent Engineer Services for 4 Laning of Godhra to Gujarat/Madhya Pradesh Border Section of NH-59 from Km.129.300 to Km.215.900 in the State of Gujarat on DBFOT Basis under NHDP Phase-IIIFour Laning of Godhra-Gujarat/MP Border SectionGujaratM/s. Intercontinental Consultants and Technocrats Pvt. Ltd.Independent Engineer ServicesSh. K.V. Singh29/9/2010
23Independent Engineer (IE) Services during Operation & Maintenance Period of Four/ Sixed Laned Section of Bharuch to Surat of NH-6 (Km.108.900 to Km.192.000) in the State of GujaratSix Laning of Bharuch-Surat SectionGujaratM/s. Consulting Engineering Group Ltd. (CEG)Independent Engineer ServicesSh. K.V. Singh12/3/2015
24Independent Engineer (IE) Services during Operation & Maintenance Period of Four/ Six Laned Section of Ahmedabad to Godhra of NH-59 (Km.4+200 to Km.122+420) in the State of GujaratFour Laning of Ahmedabad-Godhra SectionGujaratM/s. Consulting Engineering Group Ltd. (CEG)Independent Engineer ServicesSh. K.V. Singh12/3/2015
25Appointment of Independent Engineer (IE) Services during Operation & Maintenance Period of Six Laned Section of Surat-Dahisar Section from Km.263.000 to Km.502.000 of NH-8 executed as BOT Project on DBFO Basis under NHDP Phase-V in the State of GujaratSix Laning of Surat-Dahisar SectionGujaratM/s. Consulting Engineering Group Ltd. (CEG)Independent Engineer ServicesSh. K.V. Singh12/3/2015
26Independent Engineer (IE) Services during Operation & Maintenance Period of Six Laned Section from Km.108.700 to Km.192.000 - Vadodara to Bharuch Section of NH-8 in the State of Gujarat on BOT Basis - Package-I on DBFOT (Toll) BasisSix Laning of Vadodara-Bharuch SectionGujaratM/s. CDM Smith India Pvt. Ltd.Independent Engineer ServicesSh. K.V. Singh2/3/2015
27Consultancy Services for Authority's Engineer for Supervision of Six Laning of Km.192.000 to Km.198.000 between Vadodara-Surat Section of NH-8 including construction of a new four lane Extra Dosed Bridge across River Narmada in the State of Gujarat on Engineering Procurement and Construction (EPC) contract modeFour Lane Narmada Bridge SectionGujaratM/s. Aarvee Associates Architects Engineers and Consultants Pvt. Ltd. in JV with M/s. Nag Infrastructure Consulting Engineers Pvt. Ltd.Consultancy Services for Authority's EngineerSh. K.V. Singh30/5/2014
28Independent Engineer Services for 4/6 Laning of Gujarat/Maharashtra Border to Surat-Hazira Port Section of NH-6 in the State of Gujarat under NHDP Phase-III on DBFOT BasisFour Laning of Gujarat/Maharashtra Border to Surat-Hazira Port SectionGujaratM/s. Sheladia Associates Inc, USA in association with Multimedia Consultants Pvt. Ltd.Independent Engineer Services Sh. K.V. Singh8/2/2010
29Independent Engineer Services for Six Laning of Ahmedabad-Vadodara Section of NH-8 (from Km.6.400 - KM.108.700) [Length 102.300 Km.] in the State of Gujarat and improvement of Ahmedabad-Vadodara Expressway from Km.0.000 to Km.93.302 in the State of Gujarat [Length 93.302 Km.] under NHDP Phase-V on DBFOT (Toll) BasisSix Laning of Ahmedabad to Vadodara SectionGujaratM/s. Aarvee Associates Architects Engineers & Consultants Pvt. Ltd.Independent Engineer ServicesSh. K.V. Singh30/4/2012
30Independent Engineer Services for Desing, Engineering Construction, Development, Finance, Operation and Maintenance of Four/Six Laning of Gandhidham (Kandla) - Mundra Port Section from Km.71.400 of NH-8A in the State of Gujarat under NHDP Phase-III on DBFOT BasisFour Laning of Gandhidham (Kandla)-Mundra Port SectionGujaratM/s. Dorsch Consult Verkehr and Infrastructure GmbH (Transport & Infrastructure), Germany and Dorsch Consult (India) Pvt. Ltd. (Joint Venture)Independent Engineer Services Sh. K.V. Singh19/11/2010
31Independent Engineer Services for four laning of Jetpur - Somnath Section of NH-8D from Km.0.000 to Km.127.000 (Length 127.000 Km.) in the State of Gujarat on DBFOT (Toll) Basis under NHDP Phase-IIIFour Laning of Jetpur-Somnath Section GujaratM/s. Intercontinental Consultants and Technocrats Pvt. Ltd. (ICT)Independent Engineer ServicesSh. K.V. Singh17/11/2011
32Independent Engineer Services for Operation and Maintenance for Palanpur-Swaroopganj Section (Km.340.000 - Km.264.000) of NH-14 in the states of Gujarat and Rajasthan - Four Lane highway constructed on BOT (Annuity) basis under NHDP Phase-IIIFour Laning of Palanpur-Swaroopganj Section GujaratM/s. Lea Associates South Asia Pvt. Ltd.(LASA) Independent Engineer ServicesSh. K.V. Singh11/5/2011
33Independent Engineer Services for Independent Engineer - Six Laning of Samakhiyali-Gandhidham Section of NH-8A from Km.306.000 - Km.362.160 in the State of Gujarat to be executed as BOT (Toll) on DBFOT Basis under NHDP Phase-VSix Laning of Samaikhiali - Gandhidham SectionGujaratM/s. The Louis Berger Group, Inc., USA in association with M/s. Louis Berger Consulting Pvt. Ltd., IndiaIndependent Engineer ServicesSh. K.V. Singh22/12/2010
34Independent Consultancy Services for Operation & Maintenance of existing four lane Jetpur-Gondal-Rajkot Section from Km.117.000 to Km.185.000 on NH-8B in the State of GujaratFour Laning of Jetpur-Gondal-Rajkot Section GujaratM/s. Frischmann Prabhu (India) Pvt. Ltd.Independent Engineer (Operation and Maintenance)Sh. K.V. Singh19/2/2014
35Independent Engineering services for the work of 4 Lanning of Barhi-Hazaribagh section of NH-33 from Km 0.000 to Km 40.500 in the state Jharkhand under NHDP Phase-IIIFour laning of Barhi-Hazaribagh Section of NH-33Jharkhand SAi Consulting Engineers Pvt.Ltd. Independent Engineer Sh Anil Kumar1/8/2011
36Independent Engineering Services for 4- Lanning of Ranchi-Rargaon -Jamshedpur section of NH-33 from Km 114.000 to Km 277.500in the state of Jharkhand under NHDP Phase-III on DBFOT(annuity ) basis 4-laning of Ranchi-Rargaon-Mahulia-Section of NH-33Jharkhand Aarvee Associates Architects Engineers & Consultants Pvt. Ltd.Independent EngineerSh Anil Kumar30/1/2012
37Independent Engineer services for four Lanning of Hazaribagh - Ranchi section of Nh-33 from Km 40.500 to Km 114.000 in the state of Jharkhand on DBFOT basis under NHDP-IIIFour laning of Hazaribagh-Ranchi Section of NH-33Jharkhand Unihorn India Pvt. Ltd. Independent Engineer Sh Anil Kumar5/8/2010
38Mumbai4-laning of Ranchi-Rargaon-Mahulia-Section of NH-33Jharkhand Makarand JoshiIndividualSh Anil Kumar25/1/2014
39Independent Engineer services for Six – Laning of Barwa – Adda- Panagarh of NH-2 (km. 398.240 to km. 521.120) including Panagarh Bypass in the State of Jharkhand and West Bengal under NHDP Phase-V on Toll on DBFOT BasisSix – Laning of Barwa – Adda- Panagarh of NH-2Jharkhand and West BengalM/s. SA Infrastructure Consultants Pvt. Ltd.Independent EngineerSh R B Sinha20/1/2014
40Independent Engineer Services for Design, Construction, Development, Finance, Operation and Maintenance of 6-laning of Vadakkanchery-Thrissur section of NH-47 (Km. 240 to 270) in the State of KeralaSix lanning of Vadakkancherry - ThrissuresectionKeralaM/s ICT. Independent EngineerSh S K Sultania3/5/2006
41Independent Engineer for the work of Four Laning of Walayar to Vadakkanchery section of NH-47 from Existing Km. 182.25 to Km. 240.0 (Design Length – 54.0 Km) under NHDP Phase – II to be executed as BOT (Toll) Project on DBFOT pattern (Package No.NS-2/BOT/KL-2/PH-2)”. Independent Engineer for the work of Four Laning of Walayar to Vadakkanchery section of NH-47 from Existing Km. 182.25 to Km. 240.0 (Design Length – 54.0 Km) under NHDP Phase – II to be executed as BOT (Toll) Project on DBFOT pattern (Package No.NS-2/BOT/KL-2/PH-2)”. Independent Engineer for the work of Four Laning of Walayar to Vadakkanchery section of NH-47 from Existing Km. 182.25 to Km. 240.0 (Design Length – 54.0 Km) under NHDP Phase – II to be executed as BOT (Toll) Project on DBFOT pattern (Package No.NS-2/BOT/KL-2/PH-2)”. Four lanning of Walayar - Vadakkancherry sectionKeralaM/s Artefact Project Ltd.Independent Engineer Sh S K Sultania15/4/2013
42Independent Engineer Services during Operation & Maintenance (O&M) Period for 4/6 lane Talegaon-Amravati (including Amravati Bypass) section of NH-6 from Km 100.00 to Km 166.725 in State of Maharashtra under NHDP Phase-III on DBFOT basis. 4/6 Lane Talegaon-Amravati (Including Amravati Bypass) MaharashtraM/s. MSV International INC. GurgaonIndependent Engineer (O&M) Sh Ashish Asati19/8/2014
43Independent Engineer Services Design, Engineering, Construction, Development, Finance, Operation and Maintenance of 4-laning of Pune-Solapur Section of NH-9 from km 144.400 to km 249.000 in the State of Maharashtra under NHDP Phase-III on Design, Build, Finance, Operate and Transfer (DBFOT) BasisPune-Solapur Section of NH-9 MaharashtraM/s Intercontinental Consultants and Technocrats Pvt, Ltd. Independent Engineer Sh Ashish Asati20/10/2010
44Independent Engineer Services during Operation & Maintenance (O&M) for four laning of Nagpur-Kondhali Section of NH-6 from km 9.200 to km 50.000 in the State of Maharashtra on Build, Operate and Transfer BOT BasisFour laning of Nagpur-Kondhali Section of NH-6 Maharashtra M/s. Bloom Companies, LLC, USA in association with Credible Management & Consultants Pvt. Ltd.Independent Engineer (O&M) Sh Ashish Asati19/8/2014
45Independent Engineer Services or four laning of Solapur-Maharashtra/Karnataka Border Section of NH-9 from km 249.000 to km 348.800under NHDP Phase-III in the State of Maharashtra on BOT (TOLL) BasisFour laning of Solapur-Maharashtra/Karnataka Border Section of NH-9 Maharashtra M/s. Artefact Projects Ltd., NagpurIndependent EngineerSh Ashish Asati24/1/2013
46Independent Engineer Services during Operation & Maintenance (O&M) for Four laning of Satara-Kolhapur to Maharashtra State Border Section of NH-4 from km 592.240 to km 725.000 in the State of Maharashtra Four laning of Satara-Kolhapur to Maharashtra State Border Section of NH-4Maharashtra M/s. Bloom Companies, LLC, USA in association with Credible Management & Consultants Pvt. Ltd.Independent Engineer (O&M)Sh Ashish Asati19/8/2014
47Independent Engineer Services for Six laning of Pune-Satara Section of NH-4 from km 725.000 to km 865.350 (length km 140.350) in the State of MaharashtraSix laning of Pune-Satara Section of NH-4MaharashtraM/s. Aarvee Associates Architects Engineers & Consultants Pvt. Ltd.Independent EngineerSh Ashish Asati4/11/2011
48Independent Engineering Services for the “4- Laning of Panvel – Indapur Section of NH -17 from km 0.00 to km 84.00 in the State of Maharashtra under NHDP Phase III on DBFOT Basis” Four Laning of Panvel – Indapur Section of NH -17MaharashtraYongma Engg. Co. Ltd in association with Feedback Ventures Pvt. Ltd.Independent EngineerSh Ashish Asati11/1/2012
49Independent Engineer Services for four laning of Khed – Sinnar Section of NH-50 from km 42.000 to km 177.000 in the State of Maharashtra to be executed on DBFOT (Toll) basis under NHDP Phase IV.Four laning of Khed – Sinnar Section of NH-50MaharashtraSA. Infrastructure Consultants Pvt. Ltd. Independent EngineerSh Ashish Asati29/1/2014
50Independent Engineer - 4 laning MP/ Maharashtra Border – Dhule Section of NH – 3 from Km 168.500 to Km 265.000 in the State of Maharashtra under NHDP Phase III on Design, Build, Finance, Operate and Transfer (DBFOT) basis Four laning of MP/Maharashtra Border – Dhule Section of NH-3MaharashtraM/s Wilbur Smith Associates Inc. USA – Wilbur Smith Associate Pvt. Ltd. [JV].Independent EngineerSh Ashish Asati31/3/2010
51Independent Engineer Services during Operation & Maintenance phase of Four Laning of Pimpalgaon – Dhule Section of NH - 3 from Km 380.000 to Km 265.000 in the State of Maharashtra on BOT (Toll) basis under NHDP Phase-IIIFour Laning of Pimpalgaon - Dhule Sections of NH-3 MaharashtraM/s. K&J Projects Pvt. Ltd.Independent EngineerSh Ashish Asati25/6/2014
52Independent Engineer Services during Operation & Maintenance phase of Four Laning of Vadape - Gonde Section of NH - 3 from Km 539.500 to km 440.000 in the State of Maharashtra on BOT (Toll) basis under NHDP Phase-IIIFour Laning of Vadape - Gonde Section of NH - 3 MaharashtraM/s. K&J Projects Pvt. Ltd.Independent Engineer Sh Ashish Asati25/6/2015
53Independent Engineer Services for 4-laning of MP/Maharashtra Border - Nagpur section of NH-7 from km 652.000 (new km 653.225) to km 729.000 including Construction of Kamptee-Kanhan and Nagpur Bypass and Maintenance of already 4 laned section from km 14.585 to km 36.600 NH-7 (Nagpur-Hyderabad section) in the State of Maharashtra under NHDP Phase-II on DBFOT basisFour Laning of Madhya Pradesh /Maharashtra Border Nagpur Section of NH-7MaharashtraM/s. Consulting Engineers Group Ltd.Independent EngineerSh Ashish Asati12/10/2010
54Independent Consultancy Services for 4-laning of Chattisgarh / Maharashtra Border – Wainganga Bridge section from km.405.000 to km.485.000 of NH-6 in the state of Maharashtra under NHDP Phase IIIA on Build, Operate and Transfer (BOT) basisFour Laning of Chattisgarh/Maharashtra Border - Wainganga Bridge SectionMaharashtraM/s Zaidun Leeng Sdn. Bhd. – Artefact Projects (JV) Independent EngineerSh Ashish Asati25/2/2008
55Independent Engineer Services for 4-laning between Nagpur-Wainganga bridge sections of NH-6 from km.498/0 to km.544/200 in the state of Maharashtra under NHDP Phase III on Build, Operate and Transfer (BOT) basisFour laning of Nagpur-Wainganga Bridge Section of NH-6 MaharashtraM/s. Artefact Projects Ltd.Independent EngineerSh Ashish Asati16/5/2012
56Independent Engineer Services for 6 laning of Pimpalgaon-Nashk-Gonde Section of NH-3 from km 380.000 to km 440.000 in the State of Maharashtra on DBFOT (Toll) basis under NHDP Phase IIISix Laning Pimpalgaon - Nashik - Gonde Section of NH-3MaharashtraM/s. Sheladia Associates Inc. in association with M/s. Theme Engg. Services Independent EngineerSh Ashish Asati22/3/2010
57Independent Engineer for the project Four Laning of Nagpur - Betul Section of NH-69 from Km 137.000 To Km 257.000) in the State of Madhya Pradesh and from km 59.300 to km 3.000 in the State of Maharashtra under NHDP Phase IV on Design, Build, Finance, Operate and Transfer (Annuity) BasisFour Laning of Nagpur - Betul Section of NH-69 Maharashtra and Madhya PradeshM/s. Grontmij A/S in JV with M/s Frishmann Prabhu (India) Pvt. Ltd. Independent Engineer Sh Ashish Asati9/12/2011
584-laning of Jorabat Barapani (Km 0.0 to Km 61.8) on DBFOT pattern under SARDP-NE on BOT AnnuityFour Laning of Jorabat-BarapaniMeghalayaUnihorn India Pvt. Ltd.Independent EngineerSh P C Arya5/12/2011
59Four laning of Bhubanehswar PuriBhubneshwar-Puri(Approved Length 59 Km)OrissaConsulting Engineers Group Ltd Independent EngineerSh Sanjey Saxena15/7/2011
60Six Laning of Chandikhole Jagatpur Bhubaneswar section of NH 5Six Laning of Chandikhol-Jagatpur-Bhubaneswar(Approved Length 61 Km)OrissaM/s. Nicholas O’ Dwyer & Co Ltd in JV with SA Infrastructure Consultants Pvt. Ltd. Independent EngineerSh Sanjey Saxena25/1/2012
61Four laning of Panikholi-Rimuli section of NH 215 km. 0.000 to km. 163.00 in the State of Odisha under NHDP Phase III on BOT (Toll) modePanikholi-Rimoli (Approved Length 106 Km)OrissaSAI consulting engineers Pvt. Ltd., AhmedabadIndependent EngineerSh Sanjey Saxena25/6/2013
62Four/Two laning of Rimuli Roxy Rajamunda section of NH 215 km. 163.000 to km. 269.000 in the State of Odisha on BOT (Toll) mode under NHDP Phase IIIRimoli - Roxy - Rajamunda SectionOrissaUnihorn India Pvt. Ltd.Independent Engineer Sh Sanjey Saxena4/9/2013
63Four laning of Sambalpur-Baragarh Odisha/Chattisgarh Border section of NH 6 km. 0.000 to km. 88.000 in the State of Odisha on BOT (Toll) modeSambalpur-Baragarh-Chattisgarh/Orrisa BorderOrissaICT Ltd., New DelhiIndependent EngineerSh Sanjey Saxena8/11/2011
64Construction of new bridges and repair of existing 4 lane highways Balasore Kharagpur section of NH 60 in the State of Odisha and West Bengal on BOT (Toll) mode under NHDP Phase IBaleshwar Kharagpur SectionOrrisaM/s. Aarvee Associates, HyderabadIndependent EngineerSh Sanjey Saxena7/11/2012
65Independent Engineer Services for Operation and Maintenance of Swaroopganj-Pindwara section (Km. 264.0 to Km. 248.7 of NH-14) and Pindwara-Udaipur section Km. 0.000 to Km. 104.724 of NH-76 on OMT basis in the state of Rajasthan (OMT Pkg-4).Swaroopganj-Pindwara Section RajasthanM/s Lion Engineering ConsultantsIndependent Engineer Mr. R.K Rathee21/5/2015
66Consultancy services for Authority’s Engineer for Supervision of Two Laning with paved shoulders of Gulabpura to Uniara section of NH-148D from Km 69.267 (at Junction of NH-79) to Km 282.936 (at Junction of NH-116) in the state of Rajasthan under NHDP Phase-IV on Engineering, Procurement and Construction (EPC) mode.Consultancy services for Authority’s Engineer for Supervision of Two Laning with paved shoulders of Gulabpura to Uniara section of NH-148D from Km 69.267 (at Junction of NH-79) to Km 282.936 (at Junction of NH-116) in the state of Rajasthan under NHDP Phase-IV on Engineering, Procurement and Construction (EPC) mode.RajasthanM/s Theme Engineering Services Pvt. LtdAuthority EngineerSh B N Sahay30/6/2015
67Consultancy services for authority engineer for the EPC work of Supervision of widening and strengthening of Jodhpur-Barmer Section of NH-112 (Bagundi-Barmer Package-II) to two lane with paved shoulder from KM 254.800 to Km 328.900 (Length 74.1 Km) under NHDP-IV in the state of RajasthanBagundi-Barmer Section RajasthanLEA ASSOCIATES SOUTH ASIA PVT. LTDAuthority's EngineerSh B N Sahay3/2/2015
68Consultancy services for Authority Engineer for Supervision of Widening and Strengthening of Jodhpur-Barmer Section of NH-112 (Jodhpur to Pachpadra Package-I) to Two/Four lane with Paved Shoulder from Km 140.000 to Km 225.615 (Length 85.615 Km.) under NHDP- IV in the state of Rajasthan on EPC modeJodhpur-Barmer Section of NH-112 RajasthanM/s Consulting Engineers Group Ltd In association with Shri Kushalsuri Engineering Services Pvt. Ltd CEG Tower, B-11 (G), Malviya Industrial Area, Jaipur-302017 (Rajasthan)Authority EngineerSh B N Sahay26/11/2014
69Consultancy services for Authority’s Engineer for Supervision of Widening and Strengthening of Phalodi – Jaisalmer Section of NH-15 to Two/Four lane with Paved Shoulder from Km 163.400 to Km 323.857 (Length 160.457 Km.) under NHDP- IV in the state of Rajasthan on EPC modePhalodi – Jaisalmer Section of NH-15 RajasthanM/s Theme Engineering Services Pvt. Ltd., JaipurAuthority Engineer Sh B N Sahay11/2/2015
70Independent Consultancy Services for 4/6 laning for Trichy-Karur section of NH-67 from Km 138.000 to Km218.000 in the State of Tamil Nadu under NHDP-III on BOT basis.Trichy - KarurTamil NaduM/s Wilbur Smith Associates Inc. in JV with M/s Wilbur Smith Associates Pvt. Ltd.Independent Consultancy ServicesSh I S Rana6/5/2008
71Independent Engineer Services for Two-laning with paved shoulder of Dindigul-Theni Section km 2.750 to km 73.400 of NH-45 (Extn) and Theni-Kumili Section from km 215.500 to km 273.600 of NH-220 in the State of Tamil Nadu under NHDP III on Design, Build, Finance, Operate and Transfer (DBFOT) Annnuity basis2 Laning of Dindigul-Perigulam-Theni-Kumili Tamil NaduM/s Intercontinental Consultants and Technocrats Pvt. Ltd.Independent Engineer Services Sh I S Rana18/11/2011
72Independent Engineer services for 6 laning from Km 102.035 to Km 144.680 on Chengapalli to Start of Coimbatore Bypass and 4 laning from Km 170.880 to Km 183.010 from end of Coimbatore Bypass to TN/Kerala Border section of NH-47 in the State of Tamil Nadu under NHDP Phase-II on DBFOT (Toll) basis.Chengapalli to Coimbatore Bypass and End of Coimbatore Bypass to TN/Kerala Border Tamil NaduM/s Intercontinental Consultants and Technocrats Pvt. Ltd.Independent Engineer servicesSh I S Rana25/2/2011
736- Laning of Krishnagiri to Walajahpet section of NH-46 from Km.0.00 to 148.300 in the State of Tamil Nadu to be executed on DBFOT Basis under NHDP-Phase-VSix Laning of Krishnagiri-walajhapet section Tamil NaduM/s.Roughton International Ltd.- Theme Engineering Services Pvt. Ltd. Joint VentureIndependent Engineer ServicesSh I S Rana4/4/2011
74Independent Engineer Services for Six laning of Housr- Krishnagiri Section of NH-47 from Km 33.130 to Km 93.00 (Length 59.87 Km) in the State of Tamil Nadu on DBFOT (Toll) under NHDP- Phase-V.Six Laning of Hosur-Krishnagiri Tamil NaduCDM Smith Inc,In JV with Wilbur Smith AssociatesIndependent EngineerSh I S Rana14/8/2012
75Independent Engineer for 6 laning of Chennai-Tada Section from Km.11 to Km 54.40 of NH-5 in the state of Tamilnadu under NHDP Phase - V to be executed as BOT Project on DBFOT basis.Chennai - Tada (Six lane) Tamil NaduM/s SNC LAVALIN INTERNATIONAL Inc. In JV With M/s AARVEE ASSOCIATES ARCHITECTS ENGINEERS& CONSULTANTS PVT.LTD.,Middle Road East, Oakville, Ontario Canada,16H0C3.Independent EngineerSh I S Rana20/3/2009
76Independent Engineer services Six lanning of NH-4 from Walajahpet -Poonamallee (Km 106.800 to Km 13.8, approx length 93.00Km) in the State of Tamil Nadu on DBFOT Basis under NHDP Phase-VSix Laning of Walajahpet-Poonamallee Section of NH-4Tamil NaduM/s Artefact Projects Ltd.Independent Engineer ServicesSh I S Rana13/6/2013
77Independent Engineer services for two laning of Trichy-Karaikudi including Trichy Bypass road section of NH-210 from (Km 10.000 to Km 94.000) and bypass (Km 110.016 to Km 135.930) in the State of Tamil Nadu on DBFOT (Annuity) basis under NHDP-IIITwo Laning of Trichy - Karaikudi and Trichy Bypass(Approved Length 100 Km)Tamil NaduM/s Eurostudios, S,L. Spain in association with M/s Theme Engineering Services Pvt. Ltd.Independent Engineer servicesSh I S Rana2/11/2011
78Independent Engineer Services for Two lanes with paved shoulders of Tindivanam – Krishnagiri Section of NH-66 from Km 37.600 to Km 214.110 (Length 182.182 Km) on DBFOT (Annuity) basis NHDP Phase-III in the State of Tamil Nadu.Two Laning with Paved Shoulders of Tindivanam to Krishnagiri NH-66Tamil NaduM/s Theme Engineering Services Pvt. Ltd.Independent Engineer ServicesSh I S Rana17/5/2012
79Independent Engineering Services for the Work of Four Laning of Tirupati-Tiruthani-Chennai Section of NH-205 from Km 274.800 to Km 338.030 in the State of Andhra Pradesh and from Km.0.000 to Km61.470 in State of Tamil Nadu on Design,Build,Finance,Operate and Transfer (DBFOT) Toll Basis under NHDP-Phase-III.Tirupati -Tiruthani - Chennai(Approved Length 125.5 Km) Tamil Nadu[61.47]/Andhra Pradesh[63.23]M/s Wilbur Smith Associates in JV with Wilbur Smith Associates Pvt.Ltd.Independent Engineering Services.Sh I S Rana2/2/2012
80Independent Engineer services for 2-Laning with Paved Shoulders of Raebareli to Jaunpur Section of NH-231 (New NH-31) from km 0.000 to km 166.400 in the State of Uttar Pradesh Under NHDP-IV on BOT (Annuity) modeTwo Laning with Paved Shoulders of Raebareli to Jaunpur Section of NH-231Uttar PradeshM/s SA Infrastructure Consultants Pvt. Ltd. in association with Sugam Technocrats Pvt. Ltd.Independent Engineer Sh Rananjay Singh15/1/2014
81Consultancy services for Authority’s Engineer for Supervision of 2-laning with paved shoulders of Tanda Raebareli section of NH-232 (New NH-128) from km 0.000 to km 148.980 (excluding 6.180 km stretches) and NH-96 (New NH-330) from km 95.100 to km 82.000 in the State of Uttar Pradesh on EPC Basis under MoRT&H’s NH(O) schemeTwo Laning with Paved Shoulders of Tanda Raebareli Section of NH-232Uttar PradeshM/s Theme Engineering Services Pvt. Ltd.Authority's EngineerSh Rananjay Singh30/5/2014
82Consultancy services for Authority’s Engineer for Supervision of 2-laning with paved shoulders of Raebareli Banda section of NH-232 from km 152.533 to km 285.818 in the State of Uttar Pradesh on EPC Basis under MoRT&H’s NH(O) schemeTwo Laning with Paved Shoulders of Raebareli Banda Section of NH-232Uttar PradeshM/s Theme Engineering Services Pvt. Ltd. Authority's Engineer Sh Rananjay Singh30/5/2014
83Independent Engineer Services for six-laning of Delhi-Agra Section of NH-2 from km 20.500 (Length 179.5 km) in the State of Haryana and Uttar Pradesh on DBFOT (Toll) basis udner DBFOT basis under NHDP Phase-VSix Laning of Delhi-Agra Section of NH-2Uttar PradeshM/s URS Scott Wilson India Private Limited (formerly known as Scott Wilson India Private Limited) in Joint Venture with Rodic Consultants Private Limited.Independent EngineerSh Rananjay Singh18/10/2012
84Independent Engineer services for Operation & Maintenance for Kanpur-Lucknow Bypass and Lucknow-Ayodhya of NH-25 & NH-28 in the state of Uttar Pradesh on OMT basis (Total Length 217.00 km.)Kanpur-Lucknow Bypass and Lucknow-AyodhyaUttar PradeshM/s SA Infrastructure Consultants Pvt. Ltd.Independent EngineerSh. Arun Jagga2/5/2014
85Consultancy Services for Authority’s Engineer for supervision of projects of (i) 4-laning of Sultanpur to Varanasi section of NH-56 from km 134.700 to km 205.000 [Package-I] in the State of Uttar Pradesh under NHDP Phase-IV on EPC mode and (ii) 4-laning of Sultanpur to Varanasi section of NH-56 from km 205.000 to km 263.000 [Package-II] in the State of Uttar Pradesh under NHDP Phase-IV on EPC mode.4-laning of Sultanpur to Varanasi Section of NH-56 Package-I and IIUttar PradeshM/s MSV International INC. in association with Mspark Futuristics & AssociatesAuthority’s EngineerSh Rananjay Singh28/1/2016
86Independent Engineer Services for 2-Laning with paved shoulder of Raebareilly to Allahabad section of NH-24B in the State of Uttar Pradesh on DBFOT on Toll Basis under NHDP Phase-IVA.Two Laning with Paved Shoulder of Raebareilly to Allahabad Section Uttar PradeshMSV International Inc., USAIndependent Engineer Sh Rananjay Singh16/2/2012
87Independent Engineer Services for 6-Laning of Etawah-Chakeri(Kanpur) section of NH-2 from km 323.475 to km 483.687 on DBFOT (Toll) basis under NHDP Phase-V.Six Laning of Etawah-Chakeri(Kanpur) SectionUttar PradeshSTUP Consultants PVt. Ltd.Independent EngineerSh Rananjay Singh28/12/2012
88Independent Engineer services for Operation and Maintenance of Agra-Gwalior section from Km 8.00 to Km 103.00 (length 95.00 Km) and only Operation of Toll Plaza at Km 32.607 (Km 0.000 to Km 42.033 of Gwalior bypass) of NH-3 in the State of Uttar Pradesh, Rajasthan and Madhya Pradesh through Public Private Partnership (the “PPP”) on Operate, Maintain and Transfer (the “OMT”) basis-Pkg: OMT-22(NS).Agra - Gwalior Section Uttar Pradesh, Rajasthan and Madhya Pradesh M/s Lion Engineering Consultants, “Lion Tower”, Ground Floor, Plot No. 97, Elegant Estate, Near Mother Teresa School, Kolar Road, Bhopal (Madhya Pradesh) IE ServicesMr. R.K Rathee22/7/2015
89Independent Engineer Consultancy Services for 4-Laning of Haridwar-Dehradun Section of NH-58 from Km 211.00 to Km 218.200 & NH-72 from Km 165.00 to Km 196.825 in the State of Uttarakhand on DBFOT basis under NHDP Phase-IIIHaridwar - Dehradun (Approved Length 39)UttaranchalIntercontinental Consultants and Technocrats Pvt. Ltd.Independent EngineerSh Vipin Mangla8/2/2011
90Authority Engineer for Supervision of 2-laning with paved shoulder of Siatrganj-Bareily section of NH-74 (New NH-30) from Km 254.820 to Km 329.280 in the State of UP & Uttarakhand on EPC mode under NHDP Phase-IVSitarganj-BareillyUttrakhandSA Infrastructure Consultants Pvt. Ltd. in Association with Specialized Engineering Services Pvt. Ltd.Authority EngineerSh Vipin Mangla7/2/2014
91Independent Consultancy Services for 4-Laning of Muzaffarnagar-Haridwar Section of NH-58 from Km 131.00 to Km 211.00 in the State of Uttar Pradesh & Uttarakhand on DBFOT basis under NHDP Phase-IIIFour Laning of Muzaffarnagar-Haridwar Section of NH-58UttrakhandNicholas O Dwyer & Company Ltd. (Ireland) in JV with SA Infrastructure Consultants Pvt. Ltd.Independent ConsultantSh Vipin Mangla7/2/2011
92Independent Engineering Services for 4-Laning of Kashipur-Sitarganj Section of NH-74 on BOT (Toll) ( 77.2 km)Kashipur Sitarganj SectionUttrakhandArtefacts Projects Ltd.Independent EngineerSh Vipin Mangla10/6/2014
93Consultancy Services for Supervision of 2-laning with paved shoulder of Sitarganj-Tanakpur Section of NH-125 from Km 0.00 to Km 52.200 in the State of Uttarakhand under NHDP Phase-IV on EPC ModeSitarganj-Tanakpur SectionUttrakhandSA Infrastructure Consultants Pvt. Ltd.Authority EngineerSh Vipin Mangla26/2/2015
94Independent Engineer services for Four – Laning of Barasat – Krishnagar section of NH-34 from km. 31.000 to km. 115.00 in the State of West Bengal under NHDP Phase III on DBFOT (Annuity) Basis (Package No. NHDP III/BOT/WB/01)Four – Laning of Barasat – Krishnagar section of NH-34West BengalM/s. LEA Associates South Asia Pvt. Ltd.Independent EngineerSh R B Sinha27/7/2012
95Independent Engineer services for Four – Laning of Farakka – Raiganj Section of NH-34 from Km. 295.000 to Km. 398.000 in the State of West Bengal under NHDP-III on Design, Build, Finance, Operate and Transfer (DBFOT)Toll Basis.Four – Laning of Farakka – Raiganj Section of NH-34West BengalM/s. URS Scott Wilson India Pvt. Ltd. in association with Rodic Consultants P. Ltd.Indepedent EngineerSh R B Sinha12/1/2012
96Independent Engineer services for Four – Laning of Behrampore - Farakka Section of NH-34, from Km. 193.00 to Km. 295.000 in the State of West Bengal under NHDP-III on Design, Build, Finance, Operate and Transfer (DBFOT) Toll Basis.Four – Laning of Behrampore - Farakka Section of NH-34West BengalM/s. URS Scott Wilson India Pvt. Ltd. in association with Rodic consultants Pvt. Ltd.Indepedent EngineerSh R B Sinha17/5/2012
97Consultancy Services for feasibility study and preparation of Detailed Project Report for construction of new 4-lane bridge over River Ganga at downstream of Farakka Barrage including approaches connecting Farakka - Raiganj section of NH-34 in the state of West Bengal. New Four Lane Bridge over River Ganga at downstream of FarakkaWest BengalAarvee Associates Architects Engineers and Consultants Pvt. Ltd in JV with T.Y. Lin InternationalDPR ConsultantSh R B Sinha25/4/2014
98Independent Engineer services for 6 – laning of Dhankuni – Kharagpur section of NH – 6 from km. 17.600 to km. 129.00 in the State of West Bengal on BOT (Toll) basis under DBFOT pattern under NHDP – phase –V.Six laning of Dhankuni – Kharagpur section of NH – 6 West BengalM/s. Aarvee Associates Architects Engineers and Consultant Pvt. Ltd.Independent Engineer Sh R B Sinha24/11/2011
99Independent Engineer services for Four – Laning of Krishnagar – Behrampore Section of NH-34 from Km. 115.00 to Km.193.00 in the State of West Bengal under NHDP Phase –III on Design, Build, Finance, Operate and Transfer on Annuity (“BOT Annuity”)Basis (Package No: NHDP-III/BOT/WB/02)Four – Laning of Krishnagar – Behrampore Section of NH-34 West BengalM/s. Y J Engineering Company Ltd. in association with Feedback Infrastructure Services P. Ltd.Independent Engineer Sh R B Sinha8/11/2012
100Independent Engineer services for Four – Laning of Raiganj – Dalkhola section of NH-34 from Km. 398.000 to Km. 452.700 in the State of West Bengal under NHDP-III on Design, Build, Finance, Operate and Transfer (DBFOT) Toll Basis.Four – Laning of Raiganj – Dalkhola section of NH-34West BengalM/s. URS Scott Wilson India Pvt. Ltd. in association with Rodic consultants Pvt. Ltd.Independent Engineer Sh R B Sinha12/1/2012