CV's of Consultant | Yet to be Appointed

 
SrNoName of AssignmentProject NameState NameConsulatant TypeGM NameBid Submission Date 
1Consultancy services for Authority’s Engineer for Supervision of Construction of Four-Laning of balance Connectivity Road from Visakhapatnam Port to NH-16 (formerly as NH-5) under Phase-II works in the state of Andhra Pradesh on EPC modeFour-Laning of balance Connectivity Road from Visakhapatnam Port to NH-16Andhra PradeshAuthority EngineerSh. Anil Kumar Sharma27/12/2015
2Consultancy Services for project preparation of Feasibility Study/Detailed Project Report of selected road stretches for NH connectivity to Backward/Religious/Tourist places and Border areas under Bharat Mala scheme Bharat Mala Scheme Package-NHAI/B/1Andhra PradeshDPRRanjeeta Prasad15/3/2016
3Consultancy services for finanlisation of Aesthetic design of Krishna Bridges and preparation of Feasibility Study report (Outer Ring Road around Vijayawada-Guntur-Tenali Urban Agglomeration in APVijayawada-Guntur-TenaliAndhra PradeshIndependent ConsultancySh Narendra Sharma17/3/2016
4Independent Engineer services for Six- Laning of Vijayawada-Gundugolanu Section of NH-5 from Km 1076.48 to Km 1022.48 including 6-lane Hanuman Junction bypass (length 6.72 km) and 4-lane Vijayawada by pass (Length-47.88 km) [Total length: 103.59Km] in the state of Andhra Pradesh under NHDP Phase V to be executed in BOT (Toll) mode on DBFOT basisSix- Laning of Vijayawada-Gundugolanu SectionAndhra PradeshIESh Narendra Sharma22/3/2016
5Procurement of Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected state road stretches for NH connectivity to Backward Areas/Religious/Tourist Places (BRT) Scheme. Procurement of Consultancy Services for Preparation of Feasibility Study/Detailed Project Report of Selected State Road Stretches for NH Connectivity.AP, Bihar, Chhattisgarh, Gujarat, Karnataka, Maharashtra and MP etc. DPRMr. R.K Rathee31/8/2015
6Independent Engineer services during Operation & Maintenance Period for 2 laning of Muzaffarpur - Sonbarsa Section of NH - 77 from km 2.800 to km 89.00 in the State of Bihar under NHDP - III on DBFOT Annuity Basis Two Laning of Muzaffarpur-Sonbarsa Section of NH-77 BIHARO&M Services Sh Ashish Asati14/8/2015
7Authority Engineer for 2-laning with paved shoulder of Chhapra - Rewaghat - Muzaffarpur section of NH-102 in the state of Bihar on EPC mode 2 Laning with paved shoulder of Chhapra - Rewaghat - Muzaffarpur section of NH-102 BiharAuthority Engineer Sh A Srivastava18/7/2014
8Consultancy of IE for O&M services for 2 lane of Mokama - Munger section of NH-80 .2 Laning of Mokama-Munger(Approved Length 70 Km) BiharIndependent EngineerSh A Srivastava26/8/2014
9Supervision Consultancy Services for civil works for 4-laning of Patna-Gaya-Dobhi Section of NH-83 from km. 0.000 to km. 127.200 in the State of Bihar. Four Laning of Patna Gaya Dobhi Section (Km. 0.00 to Km. 127.20) of NH-83 in the State of BiharBiharSupervision ConsultantSh A Srivastava16/10/2014
10Independent Consultant Services during Operation & Maintenance Period for 4 lane bridge across river Kosi including approaches from Km. 148.550 to Km. 159.185 (Revised Ch. 145.646 to Ch. 156.281) on NH-57 and guide bund & afflux bund constructed on DBFOT (Annuity) Basis under NHDP-Phase-II of East West Corridor in the State of Bihar (2nd CallKosi BridgeBiharIndependent EngineerSh A Srivastava23/9/2014
11Independent Engineer for O&M period for two lane with paved shoulder of Khagaria-Purnea section of NH-31 from Km. 270.00 to Km. 410.00 in the State of Bihar under NHDP III on Design, Built, Finance, Operate and Transfer (Annuity).Two Lane with Paved Shoulder of Khagaria-Purnea section of NH-31 BiharIndependent EngineerSh A Srivastava23/9/2014
12Independent Engineer Services during Operation & Maintenance Period for Four laning of Patna-Bakhtiyarpur section of NH-30Four Laining of Patna -Bakhtiyarpur Section of NH-30BiharIndependent EngineerSh A Srivastava11/2/2015
13Consultancy services for Short Term Improvement Routine Maintenance of Kotwa-Mehsi-Muzaffarpur section from km 440.00 to km 520.00 of NH-28 in the state of Bihar (Length - 80 Km.).Kotwa-Mehsi-Muzaffarpur sectionBiharSupervision ConsultancySh. Arun Jagga31/3/2016
14Consultancy Services for project preparation of Feasibility Study/Detailed Project Report of selected road stretches for NH connectivity to Backward/Religious/Tourist places and Border areas under Bharat Mala scheme Bharat Mala Scheme Package-NHAI/T/27BiharDPRRanjeeta Prasad15/3/2016
15Consultancy Services for Supervision of short term improvement and routine maintenance contract of Purnea Km. 410.70 0to Dalkhola km. 447.00 of NH-31 in the State of Bihar and Dalkhola – Islampur – Siliguri - Ghoshpukur from km. 447.00 to km 551.00 (Excluding km. 498.780 – km 507.00) section of NH-31 and Salsalabari to West Bengal Assam Border from km 228.00 to km 254.50 section of NH-31C and three Periodical Renewal work: (i) from Purnea km. 410.700 to Dalklola km. 447.00 in the State of Bihar (ii) from Dalkhola (km447.00) to Islampur (km 498.70) of NH-31. And (iii) from Sonapur(km 526.0) to Ghoshpukur (km 551.0) in the state of West Bengal.Purnea to GhoshpukurBihar & West BengalSupervision ConsultantSh. Arun Jagga24/5/2016
16Consultancy Services for Supervision of short term improvement and routine maintenance O&M of Aurangabad - Gorhar from km 180.00 to km 320.00 and Gorhar to Barwa Adda from km 320.00 to 398.750 of NH-2 in the state of Bihar and JharkhandAurangabad - Gorhar and Gorhar to Barwa AddaBihar and JharkhandSupervision ConsultantSh. Arun Jagga10/7/2015
17Procurement of consultancy for preparation of Feasibility Study/Detailed Project Report of selected State road stretches for Two/Four laning with paved shoulder NH Configuration under Bharat Mala SchemeTwo/Four Laning with Paved Shoulder NH Configuration Under Bharat Mala SchemeBihar, Gujarat, Odisha, Punjab, Rajasthan, Tamil Nadu, Uttar Pradesh, West BengalPreparation of feasibility study / DPRSh. Arun Jagga28/8/2015
18Consultancy services for Authority’s Engineer for 4/6-laning of Raipur - Simga section of NH-200 in the State of Chhattisgarh under NHDP Phase IV on EPC Mode.4/6-Laning of Raipur - Simga Section ChhattisgarhAuthority's Engineer Sh Anil Kumar9/11/2015
19Consultancy services for Authority’s Engineer for 4-laning of Simga- Sargaon section of NH-200 in the State of Chhattisgarh under NHDP Phase IV on EPC Mode.4-Laning of Simga - Sargaon SectionChhattisgarhAuthority's EngineerSh Anil Kumar9/12/2015
20Consultancy services for Authority’s Engineer for 4-laning of Sargaon – Bilaspur section of NH-200 in the State of Chhattisgarh under NHDP Phase IV on EPC Mode.4-Laning of Sargaon - Bilaspur SectionChhattisgarhAuthority Engineer Sh Anil Kumar9/12/2015
21Consultancy Services for project preparation of Feasibility Study/Detailed Project Report of selected road stretches for NH connectivity to Backward/Religious/Tourist places and Border areas under Bharat Mala scheme Bharat Mala Scheme Package-NHAI/R/5GujaratDPRRanjeeta Prasad15/3/2016
22Consultancy Services for “Supervision of Short Term improvement and routine maintenance contract of Garamore-Samakhayali Section from Km 254.000 to Km 306.000 of NH-8A in the State of GujaratGaramore-Samakhayali SectionGujaratTeam LeaderSh. Kamal Kumar Arora31/3/2016
23Consultancy Services for project preparation of Feasibility Study/Detailed Project Report of road stretches selected for DMICDC under Bharat Mala schemeDMICDC Under Bharat Mala SchemeGujaratDPR ConsultantSh. Arun Jagga2/6/2016
24Consultancy services for supervision of short term improvement and routine Maintenance contract of Porbandar – Bhiladi – Jetpur from Km. 0.000 to Km. 117.600 section of NH-8B (Now NH-27) in the State of Gujarat.Porbandar – Bhiladi - JetpurGujaratSupervision Consultant Mr. R.K Rathee10/9/2015
25Consultancy services for supervision of short term improvement and routine Maintenance contract of Porbandar – Bhiladi – Jetpur from Km. 0.000 to Km. 117.600 section of NH-8B (Now NH-27) in the State of GujaratPorbandar – Bhiladi - JetpurGujaratSupervision Consultant Mr. R.K Rathee9/10/2015
26Consultancy Services for supervision of short term improvement & Routine Maintenance contract of Bamanbore-Garamore section of NH-8A (Km.182.600 to Km.254.000) and Rajkot-Bamanbore section of NH-8B (Km.185.000 to Km.216.000) in the State of Gujarat.Bamanbore-Garamore-Rajkot-Bamanbore SectionGujaratSupervision Consultant Mr. R.K Rathee23/4/2015
27Consultancy services for supervision of short term improvement and routine Maintenance contract of Ratanpur-Himatnagar-Chiloda-Ahmedabad section (Km.388.180 to Km.515.000) of NH-8 in the State of GujaratRatanpur-Himatnagar-Chiloda-Ahmedabad Section GujaratSupervision ConsultantMr. R.K Rathee23/4/2015
28Independent Engineer Services for 8-Laning of Section of NH-1 (New NH-44) from Mukarba Chowk at km 15.500 to Panipat at km 86.000 on BOT (Toll) basis in the State of Haryana 8-Laning of Section of NH-1 (New NH-44) from Mukarba ChowkHaryanaIndependent EngineerShri Rajeev Yadav26/10/2015
29Independent Engineer Services for 8-Laning of Section of NH-1 (New NH-44) from Mukarba Chowk at km 15.500 to Panipat at km 86.000 on BOT (Toll) basis in the State of Haryana8-Laning of Section of NH-1 (New NH-44) from Mukarba ChowkHaryanaIndependent Engineer Shri Rajeev Yadav26/10/2015
30Consultancy services for Authority's Engineer for supervision of the project of construction of Four laning of UP/Haryana border-Yamunanagar-Saha-Barwala-Panchkula Section of NH-73 from km 160.357 to km 179.249 (Design km 157.192 to km 176.400) in the State of Haryana on Engineering Procurement and Construction (EPC) basis (Package-3).Yamunanagar-Saha-Barwala-Panchkula SectionHaryanaAE ServicesSh. Kamal Kumar Arora2/6/2016
31Consultancy services for Authority’s Engineer for the project, development of six lane Eastern Peripheral Expressway (NH no. NE II) on EPC mode – Package no. EPE-AE-1 (Civil Package I from km. 1.000 to km. 22.000, Package II from km. 22.000 to km. 46.500 & Package III from km. 46.500 to km. 71.000 on EPC Basis)Eastern Peripheral Expressway (AE-1)Haryana & Uttar PradeshAuthority EngineerShri Rajeev Yadav12/10/2015
32Consultancy services for Authority’s Engineer for the project, development of six lane Eastern Peripheral Expressway (NH no. NE II) on EPC mode – Package no. EPE-AE-2(Civil Package IV from km. 71.000 to km. 93.000, Package V from km. 93.000 to km. 114.000 & Package VI from km. 114.000 to km. 136.000 on EPC Basis) Eastern Peripheral Expressway (AE-2)Haryana & Uttar PradeshAuthority EngineerShri Rajeev Yadav12/10/2015
33Consultancy services for Authority’s Engineer for the project, development of six lane Eastern Peripheral Expressway (NH no. NE II) on EPC mode – Package no. EPE-AE-2(Civil Package IV from km. 71.000 to km. 93.000, Package V from km. 93.000 to km. 114.000 & Package VI from km. 114.000 to km. 136.000 on EPC Basis)Eastern Peripheral Expressway (AE-2)Haryana & Uttar PradeshAuthority Engineer Shri Rajeev Yadav18/12/2015
34Consultancy Services for Authority's Engineer for supervision of development of six lane Eastern Peripheral Expressway (NH no. NE II) on EPC mode - Package I from Km 1.000 to Km 22.000, Package II from Km 22.000 to Km 46.500 & Package III from Km 71.000 on EPC Basis (Package no. EPE-AE-1).Eastern Peripheral Expressway (AE-1)Haryana & Uttar PradeshM/s Egis India Consulting Engineers Pvt. Ltd. Shri Rajeev Yadav12/10/2015
35Consultancy services for Authority’ Engineer for Supervision of project of Four Laning of Parwanoo - Solan Section of NH-22 (Now NH-5) from Km. 67.000 to Km. 106.139, under NHDP Phase-III on EPC basis in the State of Himachal PradeshFour Laning of Parwanoo - Solan SectionHimachal PradeshAuthority EngineerSh Nishoo Gupta31/7/2015
36Consultancy services for Authority’ Engineer for Supervision of project of Four Laning of Parwanoo - Solan Section of NH-22 (Now NH-5) from Km. 67.000 to Km. 106.139, under NHDP Phase-III on EPC basis in the State of Himachal PradeshFour Laning of Parwanoo - Solan Section (Re-Invite)Himachal PradeshAuthority EngineerSh Nishoo Gupta12/10/2015
37Consultancy Services for Authority Engineer for Supervision of project of Two Laning with paved shoulder of Kullu-Manali section of NH-21 (Now NH-3) from km. 272.000 to km. 309.345 on EPC Mode in Himachal Pradesh Kullu - Manali Section Of NH-21 Himachal PradeshAuthority EngineerSh Nishoo Gupta11/4/2016
38Consultancy services for Authority’s Engineer for Supervision of 4-laning of Udhampur-Ramban Section of NH-1A (now NH-44) from km. 67.00 to km. 89.00 and km. 130.00 to km. 151.00 on EPC mode in the State of Jammu & Kashmir under NHDP Phase-IIFour Laning of Udhampur-Ramban Section Jammu & KashmirAuthority EngineerSh Nishoo Gupta17/8/2015
39Consultancy services for Authority’s Engineer for Supervision of Four laning of Ramban to Banihal Section of NH- 1A (Now NH-44), from km 151.000 to km 187.00 on EPC Mode in the State of Jammu & Kashmir under NHDP Phase-IIFour Laning of Ramban to Banihal Section (Re-Invite)Jammu & KashmirAuthority EngineerSh Nishoo Gupta19/10/2015
40Consultancy services for Authority’s Engineer for Supervision of 4-laning of Udhampur-Ramban Section of NH-1A (now NH-44) from km. 67.00 to km. 89.00 and km. 130.00 to km. 151.00 on EPC mode in the State of Jammu & Kashmir under NHDP Phase-IIFour Laning of Udhampur-Ramban Section (Re-Invite)Jammu & KashmirAuthority EngineerSh Nishoo Gupta19/10/2015
41Consultancy services for Authority’s Engineer for Supervision of Four laning of Ramban to Banihal Section of NH- 1A (Now NH-44), from km 151.000 to km 187.00 on EPC Mode in the State of Jammu & Kashmir under NHDP Phase-IIFour Laning of Ramban to Banihal SectionJammu & KashmirAuthority EngineerSh Nishoo Gupta17/8/2015
42Consultancy services for Authority’s Engineer for Supervision of 2/4-lane with paved shoulders of Chas-Ramgarh section of NH-23 from km 0.000 to km 78.192 under NHDP Phase IV in the State of Jharkhand on EPC Basis.Two laning with paved shoulder of Chas-Ramgarh Section of NH-23Jharkhand Authority Engineer Sh Anil Kumar6/2/2015
43Consultancy services for Authority’s Engineer for Supervision of project of four laning of Mahulia- Baharagora - JH/WB Border Section of NH-33 (from Km 277+500 to Km 333+500) and NH-06 (from Km 199+200 to Km 183+587) (Total Length 71.61 Kms) in the State of Jharkhand under NHDP Phase III on EPC modeFour Laning of Mahulia-Baharagora JharkhandAuthority's EngineerSh Anil Kumar8/2/2016
44Authority’s Engineer for supervision of project of Two/Four Laning with Paved Shoulders of Govindpur (Rajgunj)-Chas-West Bengal Border section of NH-32 from km. 0.000 to km. 56.889 in the state of Jharkhand under NHDP Phase-IV on EPC mode.Two/Four Laning with Paved Shoulders of Govindpur (Rajgunj)-Chas-West Bengal Border SectionJharkhandAuthority's Engineer Sh Anil Kumar10/8/2016
45Consultancy services for Authority Engineer for supervision of project of Four Laning of Barhi-Hazaribagh section of NH-33 (from km.0.00 to km.40.500) in the State of Jharkhand under NHDP Phase-III on EPC mode.FOUR LANING OF BARHI-HAZARIBAGH SECTIONJharkhandAuthority EngineerSh Anil Kumar21/6/2016
46Consultancy Services for Supervision of short term improvement and routine maintenance contract of Chitradurga - Haveri - Hubli section of NH-4 from km. 189.00 to km. 404.00 in the State of Karnataka.Chitradurga - Haveri - Hubli Section of NH-4Karnataka Supervision ConsultantMr. D.K. Agarwal6/7/2015
47Independent Engineer services for 4-Laning of Hospet-Chitradurga section of NH-13 (New NH-50) from km 299+000 to km 418+750 in the state of Karnataka to be executed as BOT (Toll) on DBFOT basis under NHDP Phase-IIIFour Laning of Hospet-Chitradurga SectionKarnataka Independent EngineerSh. Aditya Kumar Ray12/6/2015
48Consultancy services for Authority’s Engineer for Development and Upgradation of Bijapur-Gulbarga-Homnabad Section of NH-218 (New NH-50) to 2-lane with paved shoulders fro km. 195.000 to km. 418.000 in the State of Karnataka under NHDP Phase-IV on EPC Mode Bijapur-Gulbarga-Homnabad Section Karnataka Authority EngineerSh. Aditya Kumar Ray10/12/2014
49Independent Engineer Service for Operation and Maintenance of Edapally – Aroor – Vytilla section of NH-66 (Formerly NH-47) from km. 342.00 to km. 358.750 (Total Length 16.750 kms.) in the State of Kerala on OMT Basis (Pkg-23).Edapally - Aroor - Vytilla Section of NH-66KeralaIndependent Engineer Mr. D.K. Agarwal14/7/2015
50Consultancy Services for Authority's Engineer for 4 laning of Existing Thiruvananthapuram bypass from Kazhakottam to Mukkola junction of NH-47 from km 0.000 to km 26.500 under NHDP Phase IIIA in the State of Kerala on EPC mode.Four Laning of Existing Thiruvanathapuram Bypass from Kazhakottam to Mukkola JunctionKeralaAuthority EngineerSh S K Sultania13/4/2015
51Independent Engineer Service for Operation and Maintenance of Edapally – Aroor – Vytilla section of NH-66 (Formerly NH-47) from km. 342.00 to km. 358.750 (Total Length 16.750 kms.) in the State of Kerala on OMT Basis (Pkg-23).Edapally – Vytilla - Aroor Section KeralaIndependent EngineerMr. D.K. Agarwal22/9/2015
52Detailed Project Report (DPR) Study for 4 laning of (i) Kerala/Karnataka Border to Vengalam of NH-17 (new NH-66) (from km 17.200 to km 230.000) (ii) Vengalam to Edapalli section of NH-17 (new NH-66) (from km 230.000 to km 438.600) (iii) Chertalai to Thiruvananthapurm Section of NH-47 (new NH-66) (from km 379.100 to km 551.900 under NHDP Phase III in the State of Kerala4 lanning of Kannur Vengalem Kuttipuram (Package -I)KeralaDPRSh S K Sultania6/10/2015
53Detailed Project Report (DPR) Study for 4 laning of (i) Kerala/Karnataka Border to Vengalam of NH-17 (new NH-66) (from km 17.200 to km 230.000) (ii) Vengalam to Edapalli section of NH-17 (new NH-66) (from km 230.000 to km 438.600) (iii) Chertalai to Thiruvananthapurm Section of NH-47 (new NH-66) (from km 379.100 to km 551.900 under NHDP Phase III in the State of Kerala4 lanning of Kannur Vengalem Kuttipuram (Package -I)KeralaDPRSh S K Sultania6/10/2015
54Consultancy Services for Authority’s Engineer for supervision of project Four laning of Rewa – Katni - Jabalpur section of NH-7 from km 242.600 to km 311.000, (Package – I,) in the State of Madhya Pradesh under NHDP Phase-IV on EPC ModeFour Laning of Rewa - Katni - Jabalpur Section (Package-I)Madhya PradeshAuthority's EngineerSh. K.V. Singh8/4/2015
55Consultancy services for Authority's Engineer for Supervision of Improvement/Augmentation for 4-laning of Rewa-Katni-Jabalpur section of NH-7 from Km 311.000 to Km 359.500 and from Km 378-500 to Km 397.000 (Pkg-II) in the State of Madhya Pradesh under NHDP Phase-IV on EPC mode Four Laning of Rewa - Katni - Jabalpur Section (Package-II)Madhya PradeshAuthority's EngineerSh. K.V. Singh9/4/2015
56Consultancy Services for Authority’s Engineer for supervision of project Four laning of Jabalpur-Lakhnadon from Km 465.500 to Km 546.425 of NH-7 in the State of MP under NHDP Phase-IV on EPC modeFour Laning of Jabalpur - Lakhnadon SectionMadhya PradeshAuthority's EngineerSh. K.V. Singh16/3/2015
57Consultancy Services for Authority's Engineer for Supervision of Improvement/Augmentation for Four laning of Rewa-Katni-Jabalpur section of NH-7 from km 242+600 to km 311 (Package-I) in the State of Madhya Pradesh under NHDP Phase IV on EPC modeFour Laning of Rewa - Katni - Jabalpur Section (Package-IV)Madhya PradeshAuthority's EngineerSh. K.V. Singh10/4/2015
58Independent Engineer services for Shivpuri - Gunna section of NH-3 (Pkg.-I) in the state of Madhya pradesh4- Laning of Shivpuri to Guna Section Package-IMadhya PradeshIndependent EngineerSh. K.V. Singh4/8/2015
59Independent Engineer Services for 4-laning of Biaora-Dewas Section from km 426.100 to Km 566.450 of NH-3 in the State of Madhya Pradesh to be executed on BOT (Toll) on DBFOT pattern under NHDP Phase-IVIndependent Engineer services for 4- laning of Biaora-Dewas section from Km 426.100 to Km 566.450 of NH-3 (Package-III) in the State of Madhya Pradesh to be executed on BOT (Toll) on DBFOT pattern under NHDP Phase-IVMadhya PradeshIndependent EngineeerSh. K.V. Singh16/10/2015
60Independent Engineer Services for four laning of Guna- Biaora Section from Km. 332.100 to Km 426.100 of NH-3 (Package- II) in the state of Madhya Pradesh to be executed on BOT (Toll) on DBFOT pattern under NHDP phase – IVIndependent Engineer services for 4- laning of Guna-Biaora section from Km 332.100 to Km 426.100 of NH-3 (Package-II) in the State of Madhya Pradesh to be executed on BOT (Toll) on DBFOT pattern under NHDP Phase-IVMadhya PradeshIndependent EngineerSh. K.V. Singh16/10/2015
61Consultancy Services for project preparation of Feasibility Study/Detailed Project Report of selected road stretches for NH connectivity to Backward/Religious/Tourist places and Border areas under Bharat Mala scheme Bharat Mala Scheme Package-NHAI/4T/16MaharashtraDPRRanjeeta Prasad15/3/2016
62Independent Engineer Services for four laning of Amravati-Chikhli (Package-I) section of NH-6 in the State of Maharashtra from km 166.000 to km 360.000 (design length 194.000 km) to be executed as BOT (Toll) basis on DBFOT pattern under NHDP Phase-IV.Four Laning of Amravati-ChikhliMaharashtraIndependent Engineer Sh Ashish Asati31/8/2015
63Independent Engineer Services for four laning of Fagne to Mah-Guj Border (Package-III) section of NH-6 in the State of Maharashtra from km 510.000 to km 650.794 to be executed as BOT (Toll) basis on DBFOT pattern under NHDP Phase-IV.Four Laning of Fagne to Mah-Guj Border MaharashtraIndependent Engineer Sh Ashish Asati31/8/2015
64“Consultancy Services for Preparation of Feasibility-cum-Detailed Project Report for (i) Flyover from Old Pune Naka NH-9 to Satrasta Chowk on NH-13 in Solapur city limit along with road development in the State of Maharashtra on EPC mode. (ii) Flyover from Boramani Naka NH-9 to Kumta Naka Jule Solapur on NH-13 along with road development in Solapur City limit in the State of Maharashtra on EPC mode. Flyover from old Pune Naka NH-9 to Satrasta Chowk on NH-13 and Flyover from Boramani Naka NH-9 to Kumta Naka Jule Solapur upto & on NH-13MaharashtraDPRSh Ashish Asati24/9/2015
65Consultancy Services for Preparation of Feasibility-cum-Detailed Project Report for (i) Flyover from Old Pune Naka NH-9 to Satrasta Chowk on NH-13 in Solapur city limit along with road development in the State of Maharashtra on EPC mode. (ii) Flyover from Boramani Naka NH-9 to Kumta Naka Jule Solapur on NH-13 along with road development in Solapur City limit in the State of Maharashtra on EPC mode. Flyover from old Pune Naka NH-9 to Satrasta Chowk on NH-13 and Flyover from Boramani Naka NH-9 to Kumta Naka Jule Solapur upto & on NH-13MaharashtraDPRSh Ashish Asati24/9/2015
66Request for proposal for appointment of Technical Consultant for Preparation of Detailed Project Report for Construction of Flyover at Wadi / MIDC Junction at km 8/600-9/650 of Nagpur Amravati Road NH-6Construction of Flyover at Wadi / MIDC JunctionMaharashtraTechnical Consultant for Preparation of Detailed Project ReportSh Ashish Asati6/7/2015
67Procurement of Technical Consultant for Preparation of Detailed Project Report for Rehabilitation and upgradation of NH Stretches (with tunnel) under NHDP-IV B. Autram Ghat section (from km 376 to km 390) part of Aurangabad-Dhule section of NH-211 in the State of MaharashtraAutram Ghat Section Part of Aurangabad-Dhule Section MaharashtraDPR ConsultantSh Ashish Asati5/6/2015
68Independent Engineer services for 4- laning of Solapur-Bijapur Section of NH-13 from km 0.00 to km 110.542 under NHDP Phase-III in the state of Maharashtra & Karnataka on DBFOT (TOLL) basisFour Laning of Solapur - Bijapur SectionMaharashtraIndependent EngineerSh Ashish Asati1/7/2015
69Consultancy services for Authority's Engineer for Supervision of Four laning of Talchar Dubari Chandikhole section of NH 200 from km. 301.89 to 428.03 (including 6.72km of NH 23 from km. 8.50 to km. 15.75) under NHDP - III in the State of Odisha on EPC modeFour/Two Laning of Talchar -Duburi- Chandikhole SectionOdishaAuthority EngineerSh Sanjey Saxena14/10/2014
70Consultancy Services for project preparation of Feasibility Study/Detailed Project Report of selected road stretches for NH connectivity to Backward/Religious/Tourist places and Border areas under Bharat Mala scheme Bharat Mala Scheme Package-NHAI/B2T/18OdishaDPRRanjeeta Prasad15/3/2016
71Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and Upgradation to Four Laning of Baharagora to Singhara Section (Km 199.200 to Km 310.806) of NH-6 (Length 111.606 kms.) in the State of Odisha under NHDP Phase-IV, on EPC Mode Four Laning of Baharagora to Singhara SectionOdishaAuthority EngineerSh Sanjey Saxena15/12/2015
72Consultancy Services for project preparation of Feasibility Study/Detailed Project Report of selected road stretches for NH connectivity to Backward/Religious/Tourist places and Border areas under Bharat Mala schemeBharat Mala Scheme Package-NHAI/B/17Odisha/ChhattisgarhDPRRanjeeta Prasad15/3/2016
73Independent Engineer Services for Construction of 4-lane (Partial Access Controlled) Laddowal Bypass from Km 0.00 to Km. 17.041 Linking NH-95 with NH-1 via Laddowal seed Farm at Ludhiana in the state of Punjab on Hybrid Annuity mode.4-lane (Partial Access Controlled) Laddowal BypassPunjabIndependent Engineer Services for Hybrid Annuity modeShri Rajeev Yadav20/9/2016
74Independent Engineer services For Operation and Maintenance of Four laned Jalandhar to Punjab/J&K Border (Km 4.230 to Km 117.750/4.000 and Km 4.000 to Km 16.350) of NH – 1 A, on OMT ba-sis in the state of Punjab, Package OMT-21AFour Laned Jalandhar - PunjabPunjabIEMr. R.K Rathee13/3/2015
75Independent Engineer Services for Operation and Maintenance of Four laned Jalandhar to Punjab/J&K Border (Km 4.230 to Km 117.750/ 4.000 and Km 4.000 to Km 16.350) of NH–1 A, on OMT basis in the State of Punjab, Package OMT-21A .Four Laned Jalandhar to Punjab/Jammu and Kashmir BorderPunjabIndependent Engineer Sh. A. K. Singh8/2/2016
76Consultancy services for Authority’s Engineer for supervision of improvement of Amritsar Bypass by construction of additional structure and service roads on NH-1 between km 448+510 to km 473+068 in the state of Punjab on EPC modeAmritsar BypassPunjabAuthority EngineerShri Rajeev Yadav5/10/2015
77Consultancy services for Authority’s Engineer for Supervision work of (i) 4-laning of Chandigarh – Kharar Section from Sector 39 (Round about) at Chandigarh (Km 0.000) to Kharar (Km. 10.185) length: 10.185 Km of NH-21 & 95 in the State of Punjab on EPC Mode and (ii) 4-laning of Kharar-Kurali Section of NH-21 from km 15.765 to km 29.900 (design chainages) (new NH-205) in the State of Punjab on EPC ModeChandigarh-Kharar and Kharar-KuraliPunjabAuthority EngineerShri Rajeev Yadav6/10/2015
78Independent Engineer Services for Operation and Maintenance of Kota-Baran Section Km 388.263 to Km 492.322 of NH-76 in the State of Rajasthan on OMT Basis (Package -8).Kota-Baran SectionRajasthanIE ServicesSh. Kamal Kumar Arora28/3/2016
79Consultancy Services for supervision of Short term improvement & Routine Maintenance contract of Kishangarh (Ajmer) to Jojro Ka Kheda (Chittorgarh) Section, Km 0.000 to Km 35.000 of NH-79A & Km 15.000 to 163.000 of NH-79 in the State of RajasthanKishangarh to Jojro Ka Kheda SectionRajasthanSupervision ConsultantMr. R.K Rathee8/5/2015
80Consultancy Services for Supervision of Short Term Improvement & Routine Maintenance Contract of Chittorgarh Byepass (Km 159.00 of NH-79 to Km 213 of NH-76) Udaipur – Chittorgarh (Km 213.00 to Km 113.830) section of NH-76 and Udaipur to Ratanpur (Km 278.00 to Km 388.180) Section of NH-8 Including 11.20 Kms two lane Udaipur Byepass from Pratapnagar to Balicha in the State of Rajasthan.Chittorgarh Bypass-Udaipur to Chittorgarh-Udaipur to Ratanpur SectionRajasthanSupervision ConsultancyMr. R.K Rathee8/5/2015
81Consultancy services for Authority's Engineer for Supervision of 2 lane with paved shoulder of Padhi-Dahod section of NH-113 from km. 180.00 to km. 267.00 (Design length 85.588) in the state of Rajasthan on EPC basis under NHDP Phase-IV.Padhi-Dahod Section RajasthanAuthority EngineerSh B N Sahay21/4/2015
82Appointment of Authority Engineer for supervision of widening & strengthening of 2 lane with paved shoulders of Uncha Nagla-Khanuawa-Roppas-Dholpur section of NH-123 under NHDP Phase-IV in the state of Rajasthan/Uttar Pradesh on EPC mode.Uncha Nagla-DholpurRajasthanAuthority EngineerSh B N Sahay21/5/2015
83Consultancy Services for supervision of Short term improvement & Routine Maintenance contract of Kishangarh (Ajmer) to Jojro Ka Kheda (Chittorgarh) Section, Km 0.000 to Km 35.000 of NH-79A & Km 15.000 to 163.000 of NH-79 in the State of Rajasthan (2 nd call)Kishangarh to Jojro Ka Kheda SectionRajasthanSupervision consultancyMr. R.K Rathee3/8/2015
84Consultancy Services for supervision of Short term improvement & Routine Maintenance contract of Kishangarh (Ajmer) to Jojro Ka Kheda (Chittorgarh) Section, Km 0.000 to Km 35.000 of NH-79A & Km 15.000 to 163.000 of NH-79 in the State of Rajasthan (2 nd call)Kishangarh (Ajmer) to Jojro Ka Kheda (Chittorgarh) SectionRajasthanSupervision Mr. R.K Rathee3/8/2015
85Consultancy Services for Supervision of Short Term Improvement & Routine Maintenance Contract of Chittorgarh Byepass (Km 159.00 of NH-79 to Km 213 of NH-76) Udaipur – Chittorgarh (Km 213.00 to Km 113.830) section of NH-76 and Udaipur to Ratanpur (Km 278.00 to Km 388.180) Section of NH-8 Including 11.20 Kms two lane Udaipur Byepass from Pratapnagar to Balicha in the State of Rajasthan (2 nd call)Two Lane Udaipur Bypass from Pratapnagar to BalichaRajasthansupervisionMr. R.K Rathee3/8/2015
86Authority EngineerBarmer- Sanchor-Gujarat BorderRajasthanAuthority EngineerSh B N Sahay16/12/2014
87Consultancy Services for Authority Engineer for Supervision of Widening and Strengthening of Barmer- Sanchor-Gujarat Border (upto Gandhav Bridge) Section of NH-15 to Construction of Service Road in Existing Four Lane from Ch. 153.000 to Ch. 157.000, Two Lane with Paved Shoulder from Ch. 157.000 to Ch. 245.505 and Four Lane from Ch. 245.505 to Ch. 259.300 under NHDP-IV in the State of Rajasthan on EPC modeBarmer- Sanchor-Gujarat BorderRajasthanAuthority EngineerSh B N Sahay16/12/2014
88Independent Engineer Services for Operation and Maintenance of Chittorgarh-Kota section from Km. 199.929 to Km. 360.429 of NH-76 (New NH-27 km 891.929 to km 1052.429) on OMT basis in the State of Rajasthan (OMT Pkg-3).Chittorgarh-Kota SectionRajasthanIndependent EngineerMr. R.K Rathee6/4/2015
89Widening and strengthening of existing Bikaner-Phalodi section of NH-15 to 4 lane from km 4.200 to 55.250 and 2 lane with paved shoulder from km 55.250 to 163.500 under NHDP Phase IV in the State of Rajasthan on BOT (Toll) basis Bikaner-Phalodi SectionRajasthanIndependent EngineerSh B N Sahay30/10/2014
90Consultancy Services for Authority Engineer for Supervision of Widening and Strengthening of Barmer- Sanchor-Gujarat Border (upto Gandhav Bridge) Section of NH-15 to Construction of Service Road in Existing Four Lane from Ch. 153.000 to Ch. 157.000, Two Lane with Paved Shoulder from Ch. 157.000 to Ch. 245.505 and Four Lane from Ch. 245.505 to Ch. 259.300 under NHDP-IV in the State of Rajasthan on EPC modeBarmer- Sanchor-Gujarat BorderRajasthanAuthority EngineerSh B N Sahay16/12/2014
91Consultancy services for Authority's Engineer for Supervision of Widening and Strengthening of Jaisalmer-Barmer section of NH-15 to two/four lane with paved shoulder from KM 0.00 to Km 153.034 (length 131.414 Km) under NHDP Phase-IV in the State of Rajasthan on EPC mode.Jaisalmer-Barmer SectionRajasthanAuthority EngineerSh B N Sahay02/01/2015
92Consultancy services for Authority's Engineer for Supervision of 2 laning with paved shoulders of Jodhpur-Pokaran section of NH-114 from (Design Chainage) km 11.000 to 101.400 and from km 126.500 to km 175.433) in the state of Rajasthan under NHDP-IV on EPC mode.Jodhpur-Pokaran SectionRajasthanAuthority's EngineerSh B N Sahay12/12/2014
93Independent Engineer Services for Operation and Maintenance of Chittorgarh-Kota Section from Km. 199.929 to Km.0360.429 of NH-76 (New NH-27 km 1052.429) on OMT basis in the State of Rajasthan (OMT Pkg-3).Chittorgarh-Kota SectionRajasthanIndependent EngineerKamal Kumar Arora14/3/2016
94Consultancy services for Authority’s Engineer for Supervision of Improvement /Augmentation of Two laning with Paved Shoulders from Km 1.600 to Km 80.000 (Existing Chainage) (Design Chainage from Km 1.600 to Km 80.133) of Nagapattinam – Thanjavur Section of NH-67 (Total Design Length 78.533 Km) in the State of Tamil Nadu on EPC mode under NHDP-III Nagapattinam-Thanjavur Section of NH-67Tamil NaduConsultancy services for Authority’s EngineerSh I S Rana30/1/2015
95Consultancy services for Authority’s Engineer for Supervision of Improvement /Augmentation of Four Laning of Km 5.000 to Km. 79.340 (Existing Chainage) [Design Chainage Km 5.000 to Km 81.000] and Two Laning with Paved Shoulders from km 79.340 to Km 118.795 (Existing Chainage) [Design Chainage Km 81.000 to Km 120.000] of Madurai- Ramanathapuram Section of NH-49 [Total Design Length 115.000 Km] in the State of Tamil Nadu on EPC mode under NHDP-III (Re-invitation)Madurai-Ramanathapuram Section (Re-invitation)Tamil NaduConsultancy services for Authority’s Engineer Sh I S Rana24/3/2015
96RFP for appointment of Technical Consultant for carrying out Feasibility study and preparation of Detailed Project Report for widening of existing 2 lane with paves shoulder to 4/6 lanes from Karur-Coimbatore (Km 218.200 to Km 332.600) section of NH-67 in the State of Tamil NaduKarur Coimbatore Section Tamil NaduFor Feasibility study and preparation of Detailed Project Report Sh I S Rana7/7/2015
97Consultancy services for Authority’s Engineer for Supervision of (a) Improvement & Augmentation of Thanjavur - Pudukottai section of NH-226 to 2 laning with Paved Shoulders from Km 0.000 to Km 55.228 (Existing Chainage from Km 0.000 to Km 56.460) (Total Design Length 55.228 Km) and (b) Improvements & Augmentation of Tirumayam - Manamadurai section of NH-226 to 2 laning with Paved Shoulders from km 77.200 to km 154.929 (Existing Chainage Km 149.800) (Total Design Length 77.729 km) under NHDP Phase -IV in the State of Tamil Nadu on EPC Basis.Thanjavur-Pudukkottai and Thirumayam-Manamadurai section of NH226TamilnaduConsultancy services for Authority’s Engineer Sh I S Rana30/9/2014
98Consultancy services for Authority’s Engineer for Supervision of Improvement & Augmentation Karaikudi - Ramanathapuram section to 2 laning with Paved Shoulders from Km.94.000 to Km.174.000 (Existing Chainage from Km.94.000 to Km.174.000 of NH 210 including 500m on SH 35 – Madurai Road (near Devakottai Rasta Railway Station) (Total Design Length 80.000 Km) on Engineering Procurement and Construction (EPC) Mode under NHDP Phase-III in the State of Tamil Nadu.Karikudi-Ramanathapuram Section TamilnaduConsultancy services for Authority’s Engineer Sh I S Rana30/9/2014
99Consultancy services for Authority’s Engineer for Supervision of Improvement & Augmentation of 4 Laning of Km 5.000 to Km.79.340 (Existing Chainage) [Design Chainage Km 5.000 to Km 81.000] and 2 Laning with Paved Shoulders from km 79.340 to Km 118.795 (Existing Chainage) [Design Chainage Km 81.000 to Km 120.000] of Madurai - Ramanathapuram Section of NH - 49 [Total Design Length 115.000 Km] in the State of Tamil Nadu on EPC mode under NHDP-III.Madurai-Ramanathapuram Section TamilnaduConsultancy services for Authority’s EngineerSh I S Rana30/9/2014
100Consultancy services for Authority's Engineer for supervison of 4 laning of Yadgiri-Warangal section of NH-202 from km 54.00 to km 150.00 (design lenght 99.005) under NHDP phase IVB to be executed in BOT (Toll) mode on DBFOT basis in the state of APFour Laning of Yadgiri - Warangal SectionTelangana Independent EngineerSh Narendra Sharma28/1/2015
101Independent Engineer services for Operation and Maintenance of Gorakhpur- Kasia- UP/Bihar border section of NH-28 from Km 279.800 to km 360.915 (new Ch. Km 285.002 to km 366.117) (Total Length = 81.115 km) on OMT basis toll collection of Toll Plaza at km 255.200 (new Ch km 256.500) (for Toll collection of BOT Annuity reach from Km 251.700 to km 279.800 (new Ch km 252.860 to km 285.215) of Gorakhpur Bypass of NH-28 in the State of UP. (OMT- Pkg. 27-A) Gorakhpur- Kasia- UP-Bihar Border SectionUttar PradeshIndependent EngineerSh. Arun Jagga2/2/2016
102Consultancy Services for project preparation of Feasibility Study/Detailed Project Report of selected road stretches for NH connectivity to Backward/Religious/Tourist places and Border areas under Bharat Mala scheme Bharat Mala Scheme Package-NHAI/BM/11Uttar PradeshDPRRanjeeta Prasad15/3/2016
103Consultancy Services for project preparation of Feasibility Study/Detailed Project Report of selected road stretches for NH connectivity to Backward/Religious/Tourist places and Border areas under Bharat Mala scheme Bharat Mala Scheme Package-NHAI/R/20Uttar PradeshDPRRanjeeta Prasad15/3/2016
104Independent Engineer services for Operation and Maintenance of Jhansi – Orai Section Stretch of NH-25 (New NH-27) from km 90.300 to km. 225.713 (Total Length 135.413) in the State Uttar Pradesh (OMT Pkg-12). Jhansi-Orai Stretch of NH-25Uttar PradeshIndependent EngineerSh. Arun Jagga9/6/2016
105Consultancy Services for project preparation of Feasibility Study/Detailed Project Report of selected road stretches for NH connectivity to Backward/Religious/Tourist places and Border areas under Bharat Mala scheme Bharat Mala Scheme Package-NHAI/R/25Uttar PradeshDPRRanjeeta Prasad15/3/2016
106Consultancy Services for project preparation of Feasibility Study/Detailed Project Report of selected road stretches for NH connectivity to Backward/Religious/Tourist places and Border areas under Bharat Mala scheme Bharat Mala Scheme Package-NHAI/R/21Uttar Pradesh/HaryanaDPRRanjeeta Prasad15/3/2016
107Consultancy Services for project preparation of Feasibility Study/Detailed Project Report of selected road stretches for NH connectivity to Backward/Religious/Tourist places and Border areas under Bharat Mala scheme Bharat Mala Scheme Package-NHAI/2TR/26West BengalDPRRanjeeta Prasad15/3/2016